Scroll Top
CAESARS FORUM
CONFERENCE CENTER
PROJECT DETAILS

CLIENT: Caesars Entertainment

GC: PENTA Building Group

SIZE: 550,000 SF

 

Photos courtesy of PENTA Building Group

PROJECT DESCRIPTION

Bombard Electric was responsible for installing all the electrical and low-voltage systems including security and audio video throughout the project.

The conference center power is distributed using medium-voltage substations and low-voltage transformers with more than 250,000 feet of conduit and 750,000 feet of feeder and branch wiring.

The ballrooms have a combined 450 floor box and wall box power/data distribution points throughout.

The lighting control system is comprised of a purely DMX system controlling each individually addressed fixture, including the color temperature of each fixture. This allows the operators to custom tune more than 7,800 down lights and 20,000 feet of linear lighting to each vendor request and/or need.

The low-voltage systems, including telephone, data, wireless access points, security, access control and audio video systems, are a complex network of 750,000 feet of conduits/cable and equipment all installed by the Bombard low-voltage team.