PROJECT DETAILS
CLIENT: Bombard Electric
SIZE: 38,145 SF (office), 30,478 (warehouse)
PROJECT DESCRIPTION
This ground-up tilt-up building project included full design and installation of all electrical systems (access control, surveillance, alarm system, tele-data systems, power, lighting, Lutron lighting control system, Schneider Electric BMS System).
The building includes a state-of-the-art training center, fitness center, break room and patio, five conference rooms and a general open floor plan. Bombard Electric designed all the systems for the building as well as the layout of the building itself.
LOCATION
4380 W. Post Rd., Las Vegas, NV
CATEGORY
Commercial